Sample unit cost consist of cost entries for ITS components that have been compiled from available sources, typically bid tabulation data from state DOTs. Costs are presented in the original year of expenditure and in inflation or index-adjusted dollars. For more information on Sample Unit Costs, see the Costs FAQ page.
Filters above this line apply immediately upon selection. Filters below require pressing 'Apply'.
Displaying 6771 - 6780 of 6780
Identifier | Cost Subsystem | Unit Cost Element | Unit Cost Component | Description | Capital Cost Per Unit | OM Cost Per Unit | Adjusted Capital Cost Per Unit | Adjusted O&M Cost Per Unit | Reported Units | Lifetime | Location | Unit Cost Type | Unit | CPI ID | CPI Name | Year | Source | Associated System Cost |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
UC2022-07207 | Roadside Information (RS-I) | Non-Standard (NS) Traffic Sign Solar Powered Sequential Dynamic Curve Warning System (Chevron) | NS Traffic Sign Solar Powered Sequential Dynamic Curve Warning System (… |
$9,000.00 | $8,739.00 | 13 | Richmond, Virginia, United States | Bid Tabulation | Each (EA) | 2 | WPU1178 | |||||||
UC2022-07208 | Roadside Information (RS-I) | Sequential Arrow Signs | Sequential Arrow Signs |
$4,220.00 | $4,097.62 | 1 | Oregon, United States | Bid Tabulation | Each (EA) | 2 | WPU1178 | |||||||
UC2022-07209 | Roadside Information (RS-I) | Sequential Arrow Signs | Sequential Arrow Signs |
$6,422.00 | $6,235.76 | 1 | Oregon, United States | Bid Tabulation | Each (EA) | 2 | WPU1178 | |||||||
UC2022-07210 | Roadside Information (RS-I) | Dynamic Message Sign - Portable | Portable Changeable Message Signs | Portable Changeable Message Signs |
$12,100.00 | $11,749.10 | 2 | Oregon, United States | Bid Tabulation | Each (EA) | 2 | WPU1178 | ||||||
UC2022-07211 | Roadside Information (RS-I) | Dynamic Message Sign - Portable | Portable Changeable Message Signs | Portable Changeable Message Signs |
$20,652.00 | $20,053.09 | 2 | Oregon, United States | Bid Tabulation | Each (EA) | 2 | WPU1178 | ||||||
UC2022-07212 | Roadside Information (RS-I) | Sequential Arrow Signs | Sequential Arrow Signs |
$5,000.00 | $4,855.00 | 2 | Oregon, United States | Bid Tabulation | Each (EA) | 2 | WPU1178 | |||||||
UC2022-07213 | Roadside Information (RS-I) | Sequential Arrow Signs | Sequential Arrow Signs |
$3,340.00 | $3,243.14 | 2 | Oregon, United States | Bid Tabulation | Each (EA) | 2 | WPU1178 | |||||||
UC2022-07214 | Roadside Information (RS-I) | Dynamic Message Sign - Portable | Portable Changeable Message Signs | Portable Changeable Message Signs |
$20,000.00 | $19,420.00 | 2 | Oregon, United States | Bid Tabulation | Each (EA) | 2 | WPU1178 | ||||||
UC2022-07215 | Roadside Information (RS-I) | Dynamic Message Sign - Portable | Portable Changeable Message Signs | Portable Changeable Message Signs |
$9,590.00 | $9,311.89 | 2 | Oregon, United States | Bid Tabulation | Each (EA) | 2 | WPU1178 | ||||||
UC2022-07216 | Transportation Management Center (TM) | Smart Work Zone Software/consulting | Smart Work Zone Software/consulting |
$315,026.00 | $339,566.53 | 1 | Johnson County,Kansas,United States | Actual | Lump Sum (LS) | 3 | PCU511210511210502 |
|