Sample unit cost consist of cost entries for ITS components that have been compiled from available sources, typically bid tabulation data from state DOTs. Costs are presented in the original year of expenditure and in inflation or index-adjusted dollars. For more information on Sample Unit Costs, see the Costs FAQ page.
Filters above this line apply immediately upon selection. Filters below require pressing 'Apply'.
Displaying 1 - 10 of 16
Identifier | Cost Subsystem | Unit Cost Element | Unit Cost Component | Description | Capital Cost Per Unit | OM Cost Per Unit | Adjusted Capital Cost Per Unit | Adjusted O&M Cost Per Unit | Reported Units | Lifetime | Location | Unit Cost Type | Unit | CPI ID | CPI Name | Year | Source | Associated System Cost |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
UC2010-00238 | Roadside Telecommunications (RS-TC) | Conduit Design and Installation - Corridor | Conduit Design and Installation - Corridor | PVC Conduit |
$64,000.00 | $74,163.20 | 30 | Portland, Oregon, United States | Actual | Per Mile | 1 | WPU1176 | ITS Integration Program Unit Cost Data… | |||||
UC2010-00762 | Transit Management Center (TR) | Transit Real Time Information System Servers & Software | Transit Real Time Information System Servers & Software |
$125,000.00 | $142,075.00 | 5 | Portland, Oregon, United States | Actual | System | 3 | PCU511210511210502 | Real-time Bus Arrival Information Systems… |
|
|||||
UC2010-00240 | Remote Location (RM) | Transit Status Information Sign | Transit Status Information Sign | Single line 120x7 readerboard (Adaptive Micro Systems P/N 1014-2001B),… |
$16,800.00 | $2,500.00 | $12,240.48 | $1,821.50 | 30 | Portland, Oregon, United States | Actual | Each (EA) | 2 | WPU1178 | ITS Integration Program Unit Cost Data… | |||
UC2010-00235 | Roadside Detection (RS-D) | Transponder Reader | Hardware and installation for transponder reader for trucks. |
$9,000.00 | $7,722.90 | Oregon, United States | Unknown | Each (EA) | 2 | WPU1178 | Developing Corridor-Level Truck Travel… | |||||||
UC2010-00239 | Roadside Information (RS-I) | Dynamic Message Sign | Variable Message Sign | This is a small dynamic message sign (DMS) installed along arterial.… |
$16,400.00 | $250.00 | $11,949.04 | $182.15 | 15 | Portland, Oregon, United States | Actual | Each (EA) | 2 | WPU1178 | ITS Integration Program Unit Cost Data… | |||
UC2010-00668 | Transit Vehicle On-Board (TV) | Mobile Data Terminal - Fixed Route Service | Mobile Data Terminal - Fixed Route Service Tri-County Metropolitan… |
$4,200.00 | $111.00 | $3,301.62 | $87.26 | 900 | Portland, Oregon, United States | Per Vehicle | 2 | WPU1178 | TCRP Synthesis 70: Mobile Data Terminals… |
|
||||
UC2010-00669 | Transit Vehicle On-Board (TV) | Mobile Data Terminal - Fixed Route Service Installation | Mobile Data Terminal - Fixed Route Service Tri-County Metropolitan… |
$500.00 | $393.05 | 900 | Portland, Oregon, United States | Per Vehicle | 2 | WPU1178 | TCRP Synthesis 70: Mobile Data Terminals… |
|
||||||
UC2010-00672 | Transit Vehicle On-Board (TV) | Mobile Data Terminal - Fixed Route Service Installation | Mobile Data Terminal - Fixed Route Service Tri-County Metropolitan… |
$1,000.00 | $786.10 | 900 | Portland, Oregon, United States | Per Vehicle | 2 | WPU1178 | TCRP Synthesis 70: Mobile Data Terminals… |
|
||||||
UC2022-07208 | Roadside Information (RS-I) | Sequential Arrow Signs | Sequential Arrow Signs |
$4,220.00 | $4,097.62 | 1 | Oregon, United States | Bid Tabulation | Each (EA) | 2 | WPU1178 | |||||||
UC2022-07209 | Roadside Information (RS-I) | Sequential Arrow Signs | Sequential Arrow Signs |
$6,422.00 | $6,235.76 | 1 | Oregon, United States | Bid Tabulation | Each (EA) | 2 | WPU1178 |