Cost Subsystem
Unit Cost Element
Unit Cost Component
Description
Electrical Conduit (4-3 inch PVC) and Directional Drilling
Capital Cost Per Unit
$25.00
Adjusted Capital Cost Per Unit
$28.29
Reported Units
130
Unit Cost Type
Unit
Linear Foot (LF)
CPI ID
1
CPI Name
WPU1176
Year
2009
Notes
Arizona Bid Tab 2008106 - Arizona DOT Estimate