Cost Subsystem
Unit Cost Component
Description

Reversible Lane Elements includes all of the operational components for a reversible lane system on an 8 mile stretch of I-15 in San Diego - see notes.

Capital Cost Per Unit
$1,931,000.00
OM Cost Per Unit
$132,000.00
Adjusted Capital Cost Per Unit
$1,622,619.30
Adjusted O&M Cost Per Unit
$110,919.60
Lifetime
15
Unit Cost Type
Unit
Lump Sum (LS)
CPI ID
2
CPI Name

WPU1178

Year
2007
Notes
Inlcudes: 3 Gate Control, Lane Control pop-ups, 12 CMS, Vehicle Detection, Lighting, 9 CCTV, Air Supply, Field Control Units, manual Control Unit, and a Device Control Unit, with five miles of aier conduit and sensor lines,and ten miles of conduit for 480 volt power lines and 10 miles of communication conduit. Costs for implementing and maintaining th CMS and CCTVs not inlcuded.